MHSC CRLDVPS Instrucciones de operaciones Pagina 15

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 64
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 14
20306750
15
Designer Series Direct Vent Gas Fireplace
After conversion to top vent conguration,
the 5" (127 mm) flue pipe should be
concentric with the 8" (203 mm) outer collar
within 1/4".
WARNING
FP1991
remove screws
Screws
Flue Pipe
Cover
Flue Pipe
Adapter
FP2833
Figure 12 -
Remove 16 screws from Flue Pipe Adapter and
Flue Pipe Cover
4. Remove six (6) screws securing the ue pipe to the
back of the intake box and remove the pipe and gasket.
Figure 13
5. Replace the ue pipe to top of rebox. Ensure the gasket
is in place and undamaged. Secure with six (6) screws.
Figure 14
6. Place the ue pipe cover and gasket removed in Step
3 over the ue opening in bottom of the intake box.
7. Ret the ue pipe adapter and gasket to the top of re-
place. Secure the adapter with six (6) screws removed
in Step 1.
FP1992
remove flue pipe
Flue Cover
Screws
Flue Pipe
FP2834
Figure 13 -
Remove Flue Pipe
FP1993
replace flue pipe
Screws
Flue Pipe
FP2835
Figure 14 -
Attach Flue Pipe to Top Vent Conguration
VENTING INSTALLATION
Vista de pagina 14
1 2 ... 10 11 12 13 14 15 16 17 18 19 20 ... 63 64

Comentarios a estos manuales

Sin comentarios